Saint-Bruno-de-Montarville

Deck construction in Saint-Bruno-de-Montarville

Saint-Bruno is the most wooded place we build, and its trees are protected by by-law. A deck here is designed around them — because the alternative is a certificate that takes two months and a fine that starts at $2,500.

Deck with landscaping and mature trees in a Saint-Bruno-de-Montarville backyard

Local conditions

What shapes a deck project in Saint-Bruno

Everywhere else, trees are a design preference. In Saint-Bruno they are a regulated part of the lot, and they drive the schedule.

01

Trees are protected, and the threshold is low

An authorization certificate is required before felling a deciduous tree 10 cm or more in diameter, or a conifer 8 cm or more, measured 30 cm from the ground. That is a smaller tree than most owners picture. If a deck layout puts a pile through one, the tree decides the timeline.

02

Sixty days, not a phone call

The cutting certificate carries a fee and a processing time measured in weeks, not days. A deck planned in May around a tree that has to come down is not a deck you sit on in June. We look for a layout that avoids the certificate entirely, and usually find one.

03

Cutting without the certificate is expensive

The minimum fine starts at $2,500, with more added per tree. No deck is worth that, and no reputable builder will quietly take a tree down to make a frame easier to set.

04

Wooded, sloping lots

Saint-Bruno lots run up against the mountain, and grade changes that other cities do not have are ordinary here. That means more structure, more stairs, and footings at several different depths on the same deck.

Permits

What Saint-Bruno asks for

A Saint-Bruno deck can involve two separate approvals: the deck itself, and anything that touches a tree.

  • The deck needs its own permit from the city’s permits department.
  • Felling a deciduous tree of 10 cm diameter or more, or a conifer of 8 cm or more, needs an authorization certificate first.
  • The certificate is granted for specific reasons — a dead or incurably diseased tree, a danger to safety, or damage to property — not simply because it is in the way.
  • Zoning requires a minimum number of trees on the lot; dropping below it means planting a replacement.
  • Ash trees may only be cut or pruned between 1 October and 15 March, when the emerald ash borer is dormant.

Municipal requirements, fees and delays change, and they can differ from one address to the next. Treat the points above as orientation rather than as the final word: we confirm the current rules with the city for your specific lot before anything is scheduled.

What we build here

Saint-Bruno deck projects

Shade, slope and roots decide more here than material catalogues do.

Decks built around trees

Pile layouts that work around root systems and trunk clearances, so the tree stays, the certificate is never needed, and the schedule holds.

Multi-level and sloped sites

Grade changes handled with levels and stairs rather than with fill, which is what the mountain lots usually call for.

Composite decks

Fiberon, Trex and TimberTech boards, which handle the damp, shaded conditions under a tree canopy far better than wood does.

PVC decks

The lowest water absorption of anything we install — worth considering where leaf litter and shade keep a surface damp well into the spring.

Questions

Saint-Bruno deck questions

What Saint-Bruno owners ask us before a first site visit.

Yes, if it is a deciduous tree 10 cm or more in diameter or a conifer 8 cm or more, measured 30 cm from the ground. An authorization certificate has to be obtained first, and it is granted for specific reasons — being in the way of a planned deck is not usually one of them.

Plan on roughly two months. That is why we start by looking for a deck layout that leaves the tree standing: it is almost always faster, cheaper and less risky than applying to remove it.

The minimum fine starts at $2,500, with an additional amount per tree. We will not do it, and we would be wary of anyone who offers to.

Often yes. Footings can usually be placed between major roots rather than through them, and a slightly adjusted layout saves the tree. It takes more planning on paper and less improvising on site.

It adds structure and usually stairs, so yes, it costs more than the same deck on flat ground. It also tends to produce the better result — a multi-level deck on a slope uses the yard far better than a single platform would.

Read next

Before you commit to a deck

Nearby

We also build here

Neighbouring cities, each with its own permit rules and its own guide.

See every service area

Quote

Planning a deck in Saint-Bruno?

Tell us the approximate dimensions, whether the yard slopes, and roughly where the trees stand. We come back with the next steps and with a layout that keeps them.

Call us Quote